Special Projects/High Rise conveys the depth and range of experience Jordan possesses in planning
for and handling virtually any type of logistics challange in Architectural Enclosure Systems construction.
Rockefeller University High Rise over FDR Drive
in Manhattan.
Jordan performs special grille work.
Jordan also performed soffit work under the building
and over the FDR during special night work
conditions.

Roof top grille work necessitates custom designed & fabricated products, special planning, coordination, and site logistics. Metal panel soffit work under building & over highway necessitates special night time & lane closure logistics and coordination.

Staten Island Ferry Terminal. A fire gutted 
this facility and Jordan was selected to perform
special stainless steel curved metal wall panel 
rehabilitation work under an accelerated, critical
path schedule. Other items Jordan performed
included temporary metal wall panel enclosure
work, as well as fencing and concrete bench work.
Jordan is well known for its ability and expertise in handling special site conditions as well as understanding the complexities of high rise construction in New York City.

This includes everything from designing and fabricating the custom products employed on many of these facilities, to managing the myriad special rigging and logistical considerations necessary to successfully fulfill our contract responsibilities.

On these projects Jordan was responsible for project aspects ranging from architectural and engineering design assistance, custom product development, special site staffing, rigging and logistics.


New York City Transit Authority Jamaica Car Barn
Rail Car Maintenance Facility necessitated special coordination and site logistics.
 
 
 

Pier 36, off of the East River in Manhattan, below, is another example of Jordan's ability to manage construction logistics on projects involving construction near and over water


Columbia University high rise metal roof 
system work.


New York City Department of Sanitation 135th 
Street Marine Transfer Station (above and below) floating on the Hudson River off the West Side Highway in Manhattan necessitated special site logistics and coordination.



Tower facility nearing completion.


Jordan furnished and installed a custom aluminum plate architectural metal wall panel system.
 


F.A.A. Air Traffic Control Tower at JFK
International Airport necessitated special
scaffolding, rigging, and safety precautions.

 

At the new Millenium Hotel in midtown Manhattan Jordan engineered and installed high rise sheer wall facade work shown at left, as well as top of building metal panel work shown above.
The work above and at left is actually on top of a new 50 story high rise located at 4 Times Square. Jordan managed the logistics of performing this steel stud framing and metal panel work.
 
 
 

 