UCONN
STAMFORD
Stamford,
Connecticut

|
 |
-

-
These
aerial shots convey the overall scope of the new UCONN campus in Stamford,
Ct.
|
 |
 |
 |
 |
-

-
Jordan
engineered and installed both the steel tube mullion support systems as
well as the architectural facade materials, inclusive of window receptors
and louvers.
|
 |
 |
 |
 |
-
At this
former Bloomingdales department store site, an existing concrete structure
was reclad.
|
-

-
Steel
tube supports engineered and installed by Jordan.
|
 |
-

-
Jordan
engineered and installed steel tube supports.
|
 |
-

-
Behind
the green glass facade, above, is a breathtaking Grand Concourse. Jordan
engineered and installed all of the white aluminum ornamental metal work
both on the exterior and the interior.
|
 |
-

-
The photo
above illustrates the Grand Concourse during construction. Jordan prepared
all of the column, beam, cross bracings, bracings, facias and soffits for
installation of the aluminum ornamental metal cladding. The completed result
is shown at left.
|
 |
 |
-

-
Jordan
engineered and installed all of the interior custom fabricated aluminum
ornamental metal work consisting of column, beam, bracing, cross bracing,
and duct covers.
|
 |
 |
 |
|
Client
Walsh
Construction Co.
Architects/Engineers
PERKINS
EASTMAN ARCHITECTS |